Avg. Base Salary (USD)
The average salary for a Controls Engineer is $78,850 in 2026
Featured Content
What Do Controls Engineers Do?
- Plan and perform work requiring electronic and mechanical theories and principles, and writing specifications.
- Manage the design and installation of electrical equipment including electrical power distribution systems, PLC's, instrumentation, variable speed AC and DC drives.
- Design calculations and prepare equipment or material specifications for electrical and electronic based systems.
- Work with the maintenance planner to schedule electrical projects.
- Develop clear and concise operator instruction manuals.
FAQs About Controls Engineers
What is the highest pay for Controls Engineers?
Our data indicates that the highest pay for a Controls Engineer is $NaN / year
What is the lowest pay for Controls Engineers?
Our data indicates that the lowest pay for a Controls Engineer is $NaN / year
How can Controls Engineers increase their salary?
Increasing your pay as a Controls Engineer is possible in different ways. Change of employer: Consider a career move to a new employer that is willing to pay higher for your skills. Level of Education: Gaining advanced degrees may allow this role to increase their income potential and qualify for promotions. Managing Experience: If you are a Controls Engineer that oversees more junior Controls Engineers, this experience can increase the likelihood to earn more.